CD VisualsMajor restoration of the Thames River shoreline in Harris Park, stretching from The Queen's Bridge to Blackfriars Bridge. Deteriorating gabion basket walls were replaced with a naturalized riverbank using rocks, native plants, and soil-stabilizing grasses.
CD Visuals was engaged by Ro-Buck Contracting to document the full construction progression to City of London standards.
Daily frames across three fixed angles, assembled ground-break to completion.
Bi-weekly aerial sweeps captured to track progress across the full restoration corridor.
Get in touch to scope your documentation cadence, camera angles, and deliverables.